Crystal River, Florida, LNG Power plant Construction Oct/2017 to Dec/2017 between the power blocks with handrails being set.

Crystal River, Florida, LNG Power plant Construction Oct/2017 to Dec/2017 between the power blocks with handrails being set.

Photo by filipdc1002

Royalties free, Commercial & Editorial use

$10.00

Rating: 3.17  out of 5  based on 6 user ratings.

Stock photo: Crystal River, Florida, LNG Power plant Construction Oct/2017 to Dec/2017 between the power blocks with handrails being set. was taken by filipdc1002 .