Crystal River, Florida, LNG Power plant Construction Oct/2017 to Dec/2017 Lifting the last filter house into place

Crystal River, Florida, LNG Power plant Construction Oct/2017 to Dec/2017 Lifting the last filter house into place

Photo by filipdc1002

Royalties free, Commercial & Editorial use

$10.00

Rating: 3.17  out of 5  based on 6 user ratings.

Stock photo: Crystal River, Florida, LNG Power plant Construction Oct/2017 to Dec/2017 Lifting the last filter house into place was taken by filipdc1002 .